• Change country
  • Malaysia

Regional Office HAURATON Asia
Lot 20-01, Level 20, Menara Hap Seng 2. Plaza Hap Seng, No. 1 Jalan P. Ramlee
50250 Kuala Lumpur / Malaysia
+60162667089
javier.monje@hauraton.com

single-point drainage

In single-point drainage, the water to be discharged is collected at the lowest point and conducted to the drainage system.

 
 
 

Regional Office HAURATON Asia
Lot 20-01, Level 20, Menara Hap Seng 2. Plaza Hap Seng, No. 1 Jalan P. Ramlee
50250 Kuala Lumpur / Malaysia
+60162667089
javier.monje@hauraton.com

 

Imprint        Privacy policy